QuotesPad
HomePlumbing › Shower install cost

How much does it cost to install a shower?

Installing a shower typically costs $1,200–$8,000. A prefab kit replacing an existing shower sits at $1,200–$3,000 installed, while a custom tiled walk-in shower runs $4,500–$10,000+. Moving drain or supply lines adds to any option.

Ranges are typical planning guides — actual price varies by region, access, materials and your local pro. Always get a written quote.

ScenarioTypical costNotes
Prefab kit, same location$1,200–$3,000Unit + labor, plumbing reused
Tub-to-shower conversion$2,500–$7,000Remove tub, new pan & walls
Custom tiled walk-in$4,500–$10,000+Pan, waterproofing, tile, glass
Move drain / supply lines+$500–$1,500Open floor or wall

What affects the price

Prefab vs custom tile

A one-piece or multi-panel acrylic kit installs in a day or two. Custom tile needs a mortared pan, waterproofing, tiling and a glass panel — days of skilled labor and the biggest price fork.

Keeping or moving the plumbing

Reusing the existing drain and valve location keeps cost down. Moving the drain, upgrading to a rain head, or adding body jets means opening the floor or wall and re-running lines.

What is uncovered on demolition

Old showers often hide water damage. Rotten subfloor, mold or corroded galvanized lines discovered mid-job add repair costs a good quote will flag as a contingency.

Pricing a job? Make a free quote or invoiceQuotesPad invoice & estimate maker — trade line items already loaded →

FAQs

How much does it cost to install a shower?

Typically $1,200–$3,000 for a prefab kit in the existing spot, $2,500–$7,000 for a tub-to-shower conversion, and $4,500–$10,000+ for a custom tiled walk-in.

How much does a tub-to-shower conversion cost?

Usually $2,500–$7,000, covering tub removal, a new shower pan, wall surround and glass. Custom tile and moved plumbing take it higher.

How long does a shower installation take?

A prefab kit takes 1–2 days. A tiled shower takes 3–7 working days because the pan, waterproofing and tile each need cure time before the next stage.